H₂ PCI projects
Delta Rhine Corridor H2 Germany North
Last updated: 30 September 2026
Provided information is based on the Hydrogen Core Network as approved on 22 October 2024 by the Federal Network Agency (Bundesnetzagentur). However, they are subject to review within the Network Development Plan (NDP) process.

Schematic representation of the pathway
The Delta Rhine Corridor H2 Germany North project establishes a cross-border connection between Germany’s hydrogen core network and the planned hydrogen grid in the Netherlands. This connection will enable hydrogen imports from the Rotterdam area to major industrial centers in Germany, such as those in the Rhineland.
On the German side the project consists of the pipeline sections Elten–St. Hubert, St. Hubert–Glehn, and the northern part of the Delta Rhine Corridor (DRC), which run from the Interconnection Point Elten at the German-Dutch border to the Cologne area. The sections of the NETG natural gas pipeline between Elten and St. Hubert and between St. Hubert and Glehn (in total approximately 98 km), which are to be converted for hydrogen transport, form the core of the connection and are scheduled to go into operation by the end of 2030. The operators are OGE and Thyssengas H2. The subsequent new Delta-Rhine-Corridor (DRC) section, approximately 50 km long, is planned to complete the approximately 148 km total route by the end of 2032.
Fact sheet
approx. 148 km
Length
Elten — St. Hubert — Glehn — Cologne
Route
2032
Comissioning
up to 76,8 GWh/d from NL to DE
Cross-border transmission capacity
planned
Status
Open Grid Europe GmbH, Thyssengas H2 / Nordrheinische Erdgastransportgesellschaft mbH & Co. KG (NETG)
Pipeline operator